Completed Project
Commercial30kW

Greenline Logistics Warehouse Solar

AbujaJan 2026Commercial

60

panels installed

₦7.2M

annual savings ngn

30

system capacity kw

42

co2 reduction tonnes

The Challenge

Greenline Logistics was spending over ₦600,000 monthly on diesel to power their 2,000m² warehouse. The generators were noisy, unreliable, and fuel costs kept rising.

Our Solution

We designed and installed a 30kW commercial solar system with 60 high-efficiency panels and a 30kWh lithium battery bank. The system covers their daytime load with excess energy stored for evening operations.

The Results

Diesel consumption reduced by 85%. Estimated annual savings of ₦7.2 million. System payback in under 2 years. CO2 emissions reduced by 42 tonnes annually.

Project Details

Client Name
Greenline Logistics
Client Type
Commercial
Location
Abuja
Commissioned
January 2026
Duration
3 weeks
System Size
30kW
Solar Panels
60 x 550W Monocrystalline
Inverter
10kW Hybrid Inverter x3
Battery
200Ah LiFePO4 x6

Want a Similar System?

We can design a similar solar system for your property. Request a free quote today.

Request a Quote

Ready to Go Solar?

Get a free, no-obligation solar quote today. Our team will design a solar system tailored to your home or business.